Storm Drainage & Detention Systems

Harris County Flood Control District: Erosion Repairs to K143-00-00-X009

2021-01-19T14:36:21-06:00By |

Rehabilitation of approximately 3,700 linear feet of the K143-00-00-X009 from Grant Road to Cypresswood Drive in the NW Harris County. Project involved the re-establishment of the flow line, erosion repairs, slope stabilization, repair and replacement of storm water outfall structures, and repair of back slope drains. The project also required the coordination with HCFCD and adjacent Utility Districts for the installation of a walking trail.

Client: Harris County Flood Control District
Project Manager: Dennis Sander, P.E.
Project Location: Houston, TX
Project Cost: $666,555

Harris County MUD 173

2021-01-19T14:37:03-06:00By |

Harris County MUD No. 173 is responsible for large detention pond within the District that had become overgrown and blockages prevented flow downstream of the pond. The project involved reconstruction of portions of the pond, regrading of the outfall ditch, erosion control measures, and landscape improvements. Coordination was required with Harris County Flood Control District and the neighboring utility district that shared responsibility for the pond and ditch.

Client: HCMUD 173
Project Manager: Erik Miller, P.E.
Project Location: Houston, TX
Project Cost: $300,000