The improvements to Mason Road included preliminary and design phase services for the reconstruction of an existing two-lane asphalt roadway section with open ditches to a four-lane concrete curb and gutter boulevard section, including paving, transitions, drainage facilities. The approximate length of the project is 0.7 mile. Sander Engineering Corporation (“SEC”) was responsible for roadway design, the preparation of a drainage analysis to determine an appropriate storm sewer outfall location, the detention system to provide the project with a storm water outfall while having no impact on Little Cypress Creek, preparation of a Storm Water Pollution Prevention Plan, preparation of a Storm Water Quality Management Plan, coordination with subcontractors for surveying, geotechnical and environmental services and coordination design and construction with adjacent projects.

Client: Harris County
Project Manager: Dennis Sander, P.E.
Project Location: Harris County, TX
Project Cost: $2,400,000
Harris County Public Infrastructure Dept: (713) 755-2948